Start with a functional brief: services, bed numbers, departments, staffing and growth plans.
Private clinics and hospitals need a DGHS licence under the Medical Practice and Private Clinics and Laboratories (Regulation) Ordinance 1982. From the 2026–27 fiscal year, licences run for two years and new facilities need Department of Environment clearance.
Treat the legal 80 sq ft per patient as a floor, not a target. International guidance (FGI 2022) uses 120 sq ft of clear floor area for a single-patient room and 100 sq ft per bed in multi-bed rooms.
Separate flows for patients, visitors, staff, clean supplies and waste are the heart of a safe hospital.
HVAC, medical gases, backup power, water and waste systems drive much of the cost and infection-control performance; design them with the architecture.
Converting an existing building can work, but check land use, structure, lifts, ramps, ceiling heights and fire escape before you buy or sign a lease.
Hospital design in Bangladesh starts with the functional brief
Before an architect draws anything, the owners, doctors and managers should agree in writing what the building must do. Every later decision, from plot size to generator rating, follows from this brief.
Services: which departments you will run (outpatients, emergency, laboratory, imaging, theatres, ICU, maternity, dialysis, wards) and which you will outsource.
Capacity: beds, operating tables, consultation rooms and imaging machines, now and in ten years.
Catchment: who you will serve and how they arrive.
Operating model: shifts, on-call rooms, staff facilities, and whether kitchen and laundry are in-house.
Budget and phasing: what opens first and what follows.
Clinic, diagnostic centre or hospital?
DGHS licenses private hospitals, clinics, diagnostic centres, dental clinics and medical check-up centres as different types of facility. A diagnostic centre with imaging needs shielding, strong floors and high power; a 100-bed general hospital needs emergency, theatres, ICU and full support services. Fix the category early, because it sets the licence conditions, staffing and space.
Licensing and rules that shape hospital design in Bangladesh
DGHS licence requirements for a private hospital or clinic
Private clinics are licensed by the Director-General of Health Services under the Medical Practice and Private Clinics and Laboratories (Regulation) Ordinance 1982. Section 9 says no licence will be issued unless the clinic has:
proper accommodation with a hygienic environment for patients
at least 80 sq ft of floor space for each patient
an air-conditioned operation theatre
essential equipment and an adequate supply of life-saving medicines
full-time registered doctors, nurses and staff, and specialists for operations and treatment
These rules are enforced. In early 2024, DGHS listed more than 1,000 unlicensed or substandard facilities and slated 727 hospitals, clinics, diagnostic centres and blood banks for closure, BenarNews reported.
2026 changes: two-year licences and environmental clearance
Under a DGHS office order reported in August 2026, licences for private hospitals, clinics and diagnostic centres issued or renewed from the 2026–27 fiscal year are valid for two years. Applicants pay two years' fees plus VAT to the treasury, then apply through the DGHS hospital and clinic licensing website. New facilities must obtain a location or environmental clearance from the Department of Environment, and facilities using narcotic drugs need a separate narcotics licence. Confirm the current document list with DGHS before you apply.
Building approval and BNBC 2020
The building itself needs land use clearance and a construction permit from RAJUK or the local authority, as our guide to building approval in Dhaka explains. The national building code places hospitals in Occupancy D (Health Care); the code's final draft text divides it into D1, normal medical facilities, and D2, emergency medical facilities that must remain operational during and after disasters. BNBC 2020 was gazetted on 11 February 2021, and it treats buildings of ten storeys or 33 metres and above as multi-storey, with stricter fire and structural requirements.
Imaging: BAERA licensing and radiation shielding
X-ray, CT and other radiation-generating equipment is regulated by the Bangladesh Atomic Energy Regulatory Authority (BAERA) under the Bangladesh Atomic Energy Regulatory Act 2012 and the Nuclear Safety and Radiation Control Rules 1997. Importing such equipment needs a BAERA permit, a user licence is needed before operation, and renewals rely on staff dosimetry (TLD) records. Imaging rooms need shielding, lead-lined doors and windows and a protected control area, designed for the specific machine with a qualified radiation safety specialist.
Medical waste and accessibility
The Medical Waste (Management and Processing) Rules 2008 require waste to be segregated where it is generated, kept in colour-coded containers, never stored untreated for more than 48 hours, and recorded for at least three years. The Rights and Protection of Persons with Disabilities Act 2013 makes access to public infrastructure a priority, so plan step-free access from the gate to every department.
Hospital design planning: zoning, flows and clinic layout
Good hospital planning keeps five flows apart as far as the site allows:
Outpatients and visitors: entrance, registration, waiting, consultation, pharmacy and billing, without passing through clinical zones.
Inpatients: from emergency or admission to wards, theatres and ICU, ideally by dedicated bed lifts and corridors.
Staff: separate entrances, changing rooms and short routes between theatres, ICU and wards.
Clean supplies: from stores and the central sterile services department (CSSD) to theatres and wards.
Dirty linen, used instruments, waste and the deceased: a separate route and, in multi-storey buildings, a separate lift or strictly managed lift times.
Stacking departments on an urban plot
On tight Dhaka plots, departments are stacked. A common logic is emergency, outpatients, pharmacy and imaging on the lower floors where the public arrives; theatres, ICU and CSSD grouped on one floor so critical patients and sterile instruments travel short distances; wards above; and heavy plant placed by weight, noise and flood risk.
The emergency entrance needs its own covered ambulance bay, separate from the main entrance, with a short, direct route to resuscitation, imaging and the theatres. Keep ambulance turning space free of parked cars.
Operation theatre suite and ICU
The theatre suite is a controlled zone: changing rooms and pre-operative holding at the entry, scrub areas, recovery beds, and a direct link to CSSD for clean and used instruments. Place the ICU close to the theatres and emergency, with clear sightlines from the nursing station to every bed.
Group X-ray, CT and ultrasound near emergency and outpatients. X-ray and CT rooms are heavy, need shielding, dedicated power and cooling, and are expensive to move later.
Space standards: how big should hospital rooms be?
Bangladesh's legal minimum under the 1982 Ordinance is 80 sq ft of floor space per patient. For room-by-room sizes, designers usually refer to international guidance. The US Facility Guidelines Institute (FGI) 2022 hospital guidelines, as summarised in a Massachusetts state compliance checklist, set:
Single-patient rooms: at least 120 sq ft of clear floor area
Multi-patient rooms: at least 100 sq ft per bed
Clearances: 3 ft between the sides of each bed and walls or fixed objects; 3 ft at the foot in single rooms and 4 ft in multi-bed rooms, so beds and equipment can pass
A hand-washing station in each patient room, in addition to the one in the toilet
Compare that with 80 sq ft and the gap is clear. A cramped ward is harder to clean and nurse in, and spreads infection more easily. Use international norms as the target for ICUs, isolation rooms and new wards, and treat the legal minimum as a floor.
How total floor area is built up
Total area comes from a schedule of accommodation: every room, its size and quantity, plus corridors, walls, shafts, plant rooms and stairs. Hospitals need a lot of circulation and plant space, so a quick "beds times a number" estimate is unreliable. Let your architect build the schedule from your service plan, then test it on the site.
Infection control and HVAC design for hospitals
In a hospital, air movement is infection control. The principle is to move air from clean to less clean areas and to dilute contaminants with enough air changes per hour (ACH). International standards set the numbers:
Operating rooms: positive pressure. CDC's guideline (2003) sets at least 15 total ACH, 3 of them outdoor air; ASHRAE/ASHE Standard 170-2017 calls for 20 ACH, 4 of them outdoor air.
Airborne infection isolation rooms, for diseases such as TB: negative pressure and at least 12 ACH for new construction (CDC). WHO's 2009 guidance also uses at least 12 ACH for airborne precaution rooms, with a negative pressure difference of at least 2.5 Pa.
Protective environment rooms, for patients with weak immunity: positive pressure, at least 12 ACH and HEPA filtration (CDC).
Emergency and radiology waiting rooms: negative pressure and at least 12 ACH (CDC).
Agree in writing which standard your design follows, and have the system tested and balanced before patients arrive. Our MEP engineers design clean-room HVAC for hospitals and laboratories; see our MEP design service.
Natural ventilation where it works
Bangladesh's climate allows natural ventilation in some areas, such as outpatient waiting, corridors and some general wards, which saves energy and, done well, dilutes airborne germs; WHO's 2009 guideline covers how. Theatres, ICU and isolation rooms still need mechanical systems with filtration and controlled pressure.
Finishes that can be cleaned
Seamless floors with coved skirting, washable walls, few ledges and hands-free taps make clinical areas easy to clean.
Planning a clinic, diagnostic centre or private hospital? Talk to our architects and MEP engineers before you commit to a site: call +880 1823-017070, email sthapatto@gmail.com or start your project online.
Medical gases, power, water and waste systems
Most hospitals pipe oxygen, medical vacuum and medical air to beds, theatres and ICUs. Plan a secure, ventilated gas store or manifold room (or a bulk liquid oxygen tank on larger sites) with delivery access, isolation valves on each floor, and alarm panels at nursing stations. Follow a recognised international medical gas standard and have the system tested and certified before use.
Theatres, ICU, emergency, labs and imaging cannot lose power. Plan a standby generator with automatic changeover, UPS for life-critical equipment, and separate essential and non-essential circuits. Electrical faults caused 9,069 of Bangladesh's 26,659 fires in 2024, about 34%, so cable sizing, quality and protection matter as much as capacity.
Plan storage, treatment and reliable pressure; hot water for clinical areas and the kitchen; purified water for dialysis and labs where needed; and enough toilets for patients, visitors and staff. Sewage and laboratory effluent need treatment, through an STP and, where required, an ETP, in line with your environmental clearance.
Design for the 2008 rules: space for colour-coded bins in every ward and theatre, a ventilated, lockable central holding room near a service exit, a route that avoids public areas, and vehicle access for the licensed collector. With the 48-hour storage limit, the collection arrangement matters as much as the room.
Fire safety for hospitals under BNBC 2020
Hospitals are among the hardest buildings to evacuate. Many patients cannot walk, and some are connected to oxygen and monitors. Fire safety design therefore plans for patients to be moved horizontally to a safe compartment on the same floor, rather than relying only on stairs.
The record shows why this matters. A Fire Service survey reported in 2017 rated 174 of 433 healthcare establishments highly risky and 248 risky, with only 11 satisfactory; missing items included evacuation ramps, fire exit plans and escape routes.
Fire compartments on each floor, with fire doors and smoke control, so patients can be moved sideways to safety
Two or more protected escape stairs wide enough for stretchers, and ramps where the site allows
Fire detection and alarm throughout, with sprinklers, hydrants and extinguishers as the code requires
Oxygen stores, generators, kitchens and laundries separated from patient areas
Emergency lighting and exit signs on backup power
Under Dhaka's streamlined approval process, buildings taller than ten storeys need a Fire Service NOC at the permit stage. Whatever the height, design to BNBC 2020's fire provisions and confirm current requirements with the Fire Service and your approving authority.
Climate-responsive, accessible and future-proof design
Design for heat, rain and flood
Deep overhangs and shading cut heat and glare; courtyards and cross-ventilation help non-critical areas; raised ground floors and plant rooms above known flood levels keep the hospital working through the monsoon; rainwater harvesting and solar hot water reduce running costs. A hospital expected to keep working after floods, cyclones or earthquakes needs a higher standard of structural and services resilience; read our guide to earthquake-resistant building design for the structural side.
Patients arrive on stretchers, in wheelchairs and on crutches. Provide step-free entrances with ramps, lifts large enough for beds, accessible toilets on every floor, handrails along corridors and clear signs in Bangla and English.
Leave land or a structural allowance for extra floors, oversize the main service risers and electrical room, and put departments likely to grow where they can extend without disrupting the theatres and ICU.
Converting an existing building into a hospital or clinic
With land scarce in Dhaka, many investors consider converting an existing building instead of building new. It can work, but check these points before you sign:
Land use: hospital use must be permitted on the plot under the Detailed Area Plan, and a change of use needs fresh approval from RAJUK or the local authority.
Structure: wards, theatres, labs, records and imaging carry heavier loads than flats. A structural engineer must check the frame against BNBC 2020 and advise on strengthening.
Lifts: ordinary residential lifts are too small for a hospital bed. You need at least one bed lift, and ideally a separate service lift.
Entrances: a step-free entrance and an ambulance drop-off, which many plots struggle to provide.
Ceiling heights: theatres and ICUs need space above the ceiling for ducts, filters and gas pipes, and low floor-to-floor heights can rule a floor out for these uses.
Fire escape: a second protected stair, fire doors and detection may have to be added.
Services: power capacity, generator space, oxygen storage, water, drainage and a waste room.
A short feasibility study, with the architect, structural and MEP engineers walking the building together, costs little compared with discovering these problems after fit-out starts.
Phasing and budgeting a hospital project
Hospital budgets have more lines than ordinary buildings. Beyond land and the structure, allow for:
Engineering services: HVAC, medical gases, electrical with backup, fire protection, plumbing, STP and lifts
Specialist interiors for theatres, ICU and laboratories
Medical equipment, IT and nurse-call systems
Licences, clearances, consultants' fees and commissioning
Pre-opening costs: recruitment, training, consumables and working capital
Phasing spreads the risk. A common approach is to open outpatients and diagnostics first to build patient numbers and cash flow, then add wards, theatres and ICU. If you phase, build the structure and main risers for the final size from day one. For building rates, see our guide to building construction cost in Bangladesh.
How Sthapatto Angon can help
Sthapatto Angon approaches hospital architecture and healthcare facility design with architecture, structural and MEP engineering in one team, so clinical planning, structure and building services develop together from the first sketch. Our MEP engineers design HVAC including clean rooms, electrical systems, plumbing, fire detection and protection, lifts and STP/ETP, and we provide project management consultancy for our own designs.
A 100-bed, six-storey general hospital at the BEPZA Economic Zone in Mirsharai, Chattogram, planned to serve about 300,000 people (under construction)
Hilton Tower, Feni: an 18-storey, 112,000 sq ft mixed-use building with shops, hospital facilities and apartments (under construction)
An Honourable Mention for our team, Young Architects category, in the UIA-PHG 2017 international competition on the Healthcare Facility of the Future
See our hospital and hospitality projects.
Frequently asked questions
What licence is needed to open a private hospital or clinic in Bangladesh?
You need a licence from DGHS under the Medical Practice and Private Clinics and Laboratories (Regulation) Ordinance 1982. From the 2026–27 fiscal year, licences are valid for two years and are applied for online after paying the fee and VAT; new facilities also need Department of Environment clearance. Imaging equipment needs BAERA licensing, and the building needs approval from RAJUK or the local authority.
How much space is required per bed in a private clinic in Bangladesh?
The 1982 Ordinance requires at least 80 sq ft of floor space per patient. International guidance such as FGI 2022 uses 120 sq ft of clear floor area for single rooms and 100 sq ft per bed in multi-bed rooms, plus clearances around each bed. Plan to the higher figures wherever you can.
How do you plan a 100-bed hospital?
Start with the service plan (departments, theatres, ICU beds, imaging), turn it into a schedule of accommodation, then test layouts on the site for flows, emergency access and expansion. Design HVAC, medical gases, power and fire safety in parallel, and check licensing requirements before drawings are final.
Can a residential building be converted into a hospital in Dhaka?
Sometimes. Land use must allow hospital use, the change of use needs approval, and the structure must be checked for heavier loads. You will usually also need a bed lift, ramps and an extra fire stair.
Do X-ray and CT rooms need special approval in Bangladesh?
Yes. Radiation-generating equipment is regulated by BAERA: imports need a permit, a user licence is needed before operation, and renewals rely on staff dosimetry records. Rooms need shielding designed for the specific equipment.
How many air changes does an operating theatre need?
International standards keep operating rooms at positive pressure. CDC guidance sets at least 15 ACH (3 of outdoor air), while ASHRAE/ASHE Standard 170-2017 calls for 20 ACH with 4 of outdoor air. Agree the standard with your MEP engineer and commission the system before use.
How should medical waste be handled in a hospital in Bangladesh?
Under the 2008 rules, segregate waste at source into colour-coded containers, store untreated waste for no more than 48 hours, use licensed handlers, and keep records for at least three years. The building needs bin space in every clinical area and a central holding room with its own exit route.
বাংলাদেশে বেসরকারি হাসপাতাল বা ক্লিনিকের নকশা শুরু হয় সেবার পরিকল্পনা দিয়ে: কোন কোন বিভাগ থাকবে, কত শয্যা, কয়টি অপারেশন থিয়েটার ও আইসিইউ বেড। ১৯৮২ সালের অধ্যাদেশ অনুযায়ী স্বাস্থ্য অধিদপ্তরের (ডিজিএইচএস) লাইসেন্স লাগে, আর প্রতি রোগীর জন্য কমপক্ষে ৮০ বর্গফুট জায়গা ও শীতাতপনিয়ন্ত্রিত অপারেশন থিয়েটার থাকা বাধ্যতামূলক। ২০২৬-২৭ অর্থবছর থেকে লাইসেন্সের মেয়াদ দুই বছর, এবং নতুন প্রতিষ্ঠানের জন্য পরিবেশ অধিদপ্তরের ছাড়পত্র লাগবে। আন্তর্জাতিক নির্দেশিকায় একক কক্ষে ১২০ বর্গফুট এবং ওয়ার্ডে প্রতি শয্যায় ১০০ বর্গফুট ধরা হয়, তাই ৮০ বর্গফুটকে সর্বনিম্ন সীমা হিসেবেই দেখুন। রোগী, দর্শনার্থী, কর্মী, পরিষ্কার সরবরাহ ও বর্জ্যের পথ আলাদা রাখুন। অপারেশন থিয়েটারে পজিটিভ প্রেশার ও ঘণ্টায় ১৫–২০ বার বাতাস পরিবর্তন, আর আইসোলেশন কক্ষে নেগেটিভ প্রেশার দরকার। এক্স-রে ও সিটির জন্য বাংলাদেশ পরমাণু শক্তি নিয়ন্ত্রণ কর্তৃপক্ষের (বায়েরা) লাইসেন্স ও রেডিয়েশন শিল্ডিং লাগে। মেডিকেল বর্জ্য উৎসেই আলাদা করতে হয় এবং অশোধিত অবস্থায় ৪৮ ঘণ্টার বেশি রাখা যায় না। পুরোনো ভবনকে হাসপাতালে রূপান্তরের আগে কাঠামো, বেড লিফট, র্যাম্প, সিলিংয়ের উচ্চতা ও অগ্নিনিরাপত্তা যাচাই করুন। পরামর্শের জন্য ফোন করুন: ০১৮২৩-০১৭০৭০।
Ready to plan your hospital or clinic?
Share your service plan, bed numbers and site or building details, and our architects and engineers will help you test what fits, what the rules require and how to phase it. Call +880 1823-017070, email sthapatto@gmail.com or start your project online.
Laws of Bangladesh, Legislative and Parliamentary Affairs Division (1982): The Medical Practice and Private Clinics and Laboratories (Regulation) Ordinance, 1982
bdnews24.com (11 August 2026): Private hospital licences extended to two years under new health rules
The Daily Observer (10 August 2026): Govt extends private clinic license validity to 2yrs
BenarNews (February 2024): Bangladesh shuts down hundreds of unlicensed hospitals, facilities
Prothom Alo (25 September 2025): For the safe and peaceful use of ionizing radiation
Dhaka Tribune (6 December 2023): The legal side of medical waste disposal
The Daily Star, Law and Our Rights (2022): The rights of persons with disabilities
Bangladesh National Building Code, final draft (2012), Part 3 Chapter 2: Classification of Buildings Based on Occupancy (Public.Resource.Org)
Slideshare (undated): Presentation on Bangladesh National Building Code 2020, Part 3
The Business Standard (25 February 2021): Updated National Building Code comes into effect
Prothom Alo (13 February 2019): Building design approval at 4 levels instead of 16
Massachusetts Department of Public Health (FGI Guidelines 2022): Compliance checklist, medical/surgical patient care unit
CDC (2003, page updated 2023): Guidelines for Environmental Infection Control in Health-Care Facilities, Appendix B: Air
CDC (2003, page updated 2023): Guidelines for Environmental Infection Control, Key Terms
ASHRAE Journal (May 2018): CFD Analysis of Hospital Operating Room Ventilation Systems, Part I: Analysis of Air Change Rates
World Health Organization (2009): Natural Ventilation for Infection Control in Health-Care Settings (NCBI Bookshelf)
The Daily Star (12 October 2017): Hospitals in grave peril
The Financial Express (29 January 2025): BD sees 26,659 fires in 2024 that kill 140 persons
This article is general information, not legal, medical or regulatory advice. Licensing conditions, codes and procedures change; confirm current requirements with DGHS, BAERA, the Department of Environment, the Fire Service and your approving authority before you invest.