Factory Fire Safety Design in Bangladesh: Approvals and Essentials
By the Sthapatto Angon design team, Dhaka. Updated October 2026.
Short answer: a factory's fire safety is decided at the design stage: protected escape stairs, fire separation, detection and alarm, firefighting water and access for fire engines. The Fire Service and Civil Defence (FSCD) approves the fire safety plan before the factory is set up and issues a fire safety effectiveness certificate after inspection. Export garment factories supplying brands under the International Accord are also inspected by the RMG Sustainability Council (RSC).
The rules that apply
Bangladesh National Building Code (BNBC 2020): Part 4 covers fire protection for all new buildings, including factories.
Fire Prevention and Extinguishing Act 2003: requires fire safety plan approval and a valid effectiveness certificate; operating without one is a violation.
Zone rules: inside EPZs and economic zones, the zone authority's building requirements apply as well.
RSC Technical Guidelines Standard: for export garment factories covered by the International Accord, the RSC inspects fire, electrical, structural and boiler safety and tracks remediation. Its standard applies BNBC 2020 to new construction and draws on NFPA codes.
Approval steps
Fire safety plan approval from FSCD, based on the design drawings, before the factory is set up.
Construction following the approved drawings, with fire systems installed and tested.
Inspection and effectiveness certificate from FSCD, confirming the firefighting system works, before and during operation.
Design essentials
These points come from BNBC 2020 practice and the RSC Technical Guidelines Standard used for export garment factories. Your engineer applies the exact figures for your building's use, height and number of workers.
Enough exits: at least two exits from every floor; the RSC standard requires three above 500 occupants per storey and four above 1,000, placed well apart.
Protected stairs: enclosed exit stairs with fire-rated walls (1 hour for up to three storeys, 2 hours for four or more under the RSC standard) and self-closing fire doors.
Doors that always open: exit doors must never be locked in the direction of escape, and roll-down or sliding gates and shutters are not allowed on escape routes.
Separate the risky rooms: boiler rooms (1-hour separation), generators and oil-filled transformers (2-hour separation) and combustible storage (1-hour separation), or set them outside at a safe distance.
Detection and alarm: automatic fire alarm and detection throughout industrial floors, designed to NFPA 72, with lit exit signs and emergency lighting.
Water for firefighting: a fire water tank and pump, standpipes with hose connections in the stairs, and sprinklers throughout any building with an occupied floor above 23 m.
Access and spacing: roads for fire engines around the building and the required spacing between buildings.
Electrical safety: correctly rated cables, protected distribution boards, earthing and lightning protection, designed with the MEP engineers.
Structural safety: no extra floors or heavy machinery beyond what the structure was designed for. The Rana Plaza collapse in 2013, which killed 1,138 people, began with floors and loads the building was never designed to carry.
Existing factories: audit before you expand
Many older buildings were not built to the fire code. In November 2025 the Fire Service found that only 55 of 164 factories in Chattogram EPZ held a valid fire safety certificate, and that many buildings put up before 2008 had been built without following the code. Typical upgrades are an added protected stair, fire doors, detection and alarm, separated storage and a new hydrant system. Plan these before adding floors or machinery.
How we help
We build fire safety into the layout from the first sketch, and our MEP engineers design detection, alarm, hydrant and sprinkler systems together with the architecture and structure. We prepare the drawings for the fire safety plan and coordinate with the approving authorities. Read our guides to factory planning and building in an EPZ or economic zone, or see our MEP engineering service.
Planning a new factory or an expansion?
Call +880 1823-017070 or email sthapatto@gmail.com. Start your project.
Sources
RMG Sustainability Council: Technical Guidelines Standard V1.0
The Daily Star: CEPZ factories and fire safety certificates (10 November 2025)