How We Work: From First Brief to Finished Building

Every Sthapatto Angon project moves through the same clear stages, with architects and engineers working together from the first meeting. Here is what happens at each stage, what you can expect from us and what we will need from you.

In short: we start with your brief and a site visit, test what the land allows, develop a concept, coordinate architecture with structural, MEP, interior and landscape design, prepare the drawings that approving authorities and contractors need, and stay involved through construction.

1. Brief and site visit

We meet you, visit the site and listen. For a home or office, that means how many people will use the building and how. For a factory, it means the production process, the machinery, the raw materials and finished goods, and your plans to expand. We also look at the land itself: road access, neighbouring buildings, ground level, drainage and the direction of sun and wind.

You receive: a written brief and a list of the documents and surveys the design will need.

2. Feasibility and concept design

Before drawing a building, we check what the site allows: the permitted land use, the floor area ratio (FAR), setbacks, height limits and road width. We then test layout options, place the building to suit the climate, and agree a concept with you.

You receive: concept drawings, an area statement and the design direction for the next stage.

3. Design development with engineers

The concept becomes a coordinated design. Our structural engineers choose the structural system (RCC, steel or composite), our MEP engineers plan the mechanical, electrical and plumbing systems, and our interior and landscape designers join where the project needs them. Our sustainability team studies daylight, ventilation and energy use so the building performs well in Bangladesh's hot, humid climate.

You receive: developed plans, sections, elevations and 3D views, ready for your approval.

4. Approval drawings

We prepare the drawings and documents that approving authorities ask for, following the Bangladesh National Building Code (BNBC 2020) and the local building rules. Depending on the project, approvals may involve RAJUK or another development authority, the Fire Service and Civil Defence, the Department of Environment, the Department of Inspection for Factories and Establishments (DIFE), BEPZA or Invest Bangladesh (formerly BEZA). Our building approval guide explains the usual steps in Dhaka.

5. Construction drawings and specifications

Once the design is fixed, we produce the detailed architectural, structural and MEP drawings and specifications that contractors build from. Because every discipline works from the same coordinated drawings, clashes are solved on paper instead of on site.

6. Construction support and project management

During construction we visit the site, answer contractor questions and check that the work matches the drawings. Through our project management consultancy (PMC) and construction services, we can also manage the site, coordinate contractors, control quality and keep the project on time and on budget.

7. Completion and handover

At the end, we inspect the finished work with you, list anything that still needs fixing and help you put together the documents you need to occupy and run the building.

Working with specialist partners

For large and specialised projects we work with local and international experts. Past collaborations include ARC Architectural Consultants, Orthotropic Engineers & Architects Ltd., and professors and architects from South Korea on institutional projects funded by the Asian Development Bank.