The building code says a sub-soil investigation shall be done before constructing a new building. Your structural engineer designs the foundation from it.
Number of boreholes: at least three for a small building (not in one line), at least five for larger ones. BUET's guideline is 3 up to 3 katha, 5 for 3 to 5 katha and 8 for 6 to 10 katha.
Depth follows the foundation: at least 6 m below the expected pile tip. BNBC 2020 also classifies the site for earthquake design from the top 30 m of soil.
Soil test cost in Bangladesh: BUET charges Tk 80,000, Tk 1,00,000 or Tk 1,35,000 per borehole in Dhaka for depths up to 20, 25 or 30 m, including tests and report (April 2026). Private quotes vary.
In the report, read the layers, SPT N-values, water table, allowable bearing capacity and recommendations. Clay with N below 4 is soft; sand with N below 10 is loose.
Dhaka's ground changes within short distances. A RAJUK and BUET study places about 55 to 60 percent of Dhaka in the two highest liquefaction-hazard zones.
What is a soil test for building construction in Bangladesh?
When people say "soil test" for a building, they mean a geotechnical or sub-soil investigation, not an agricultural nutrient test. It finds out what lies under your plot, layer by layer, and how much load each layer can carry without failing or settling too much.
The Bangladesh National Building Code (BNBC) sets the aims: establish the soil and groundwater conditions, determine the soil's properties and gather other relevant site knowledge. It also asks for a competent graduate engineer, experienced in sub-soil exploration, to supervise drilling, field tests and sampling.
The report tells your structural engineer which layers exist and how strong they are, where the groundwater sits, how much load a footing or pile can carry, how much the building may settle, whether any layer could liquefy, and the site class for earthquake design. Without it, the engineer has to guess: guess low and the foundation is unsafe; guess high and you pay for piles you may not need.
When is a soil test required? BNBC 2020 and RAJUK
What the building code says
The soils and foundations chapter of BNBC (Part 6, Chapter 3) states that a sub-soil investigation shall be done before constructing a new building, or before altering the foundation of an existing one. It must describe the soil's character, load-bearing capacity and settlement behaviour.
BNBC 2020's earthquake chapter goes further. For buildings in Seismic Design Category C or D, which under the code's table includes every building in Dhaka's seismic zone, the investigation should also assess liquefaction potential, differential settlement, slope instability and earthquake pressure on basement walls. Our guide to earthquake-resistant building design explains these categories.
RAJUK plan pass and structural drawings
In March 2023, a RAJUK member said that from 1 April that year structural drawings must be approved as well as architectural plans (The Daily Star Bangla). A structural design cannot be prepared properly without soil data, so treat the soil test as part of the plan pass work. Document checklists change, so confirm the current list with your architect; our building approval guide for Dhaka explains the process.
The code allows fewer investigation points where ground is known to be uniform and strong, if local experience justifies it. That is a judgement for engineers, not a reason to skip the test, even for a small village house.
Number of boreholes and depth: how much soil testing your building needs
A Housing and Building Research Institute (HBRI) presentation on BNBC 2020 summarises the code's guidance:
Small buildings: at least 3 boreholes, not all in one line, so the engineer can see how layers slope across the site
Large buildings: at least 5, one at each corner and one at the centre
At least 67 percent of the boreholes inside the building footprint
Closer spacing as soil becomes more erratic, down to about 15 m apart
BUET's testing bureau (BRTC) sets a minimum of 3 borings per site and this plot-based guideline (1 katha = 720 sq ft in Dhaka):
Up to 3 katha (2,160 sq ft): 3 boreholes
3 to 5 katha (2,160 to 3,600 sq ft): 5 boreholes
6 to 10 katha (4,320 to 7,200 sq ft): 8 boreholes
The code's principle is to explore every layer the building will stress:
For heavily loaded multi-storey buildings, at least half the boreholes should reach 1.5 times the building width below the lowest part of the foundation.
For piles, borings should extend at least 6 m below the expected pile tip, and deeper below a large pile group.
No investigation should be shallower than 2 m, and it is good practice to take at least one boring well below the zone the building affects.
Earthquake design adds another reason to go deep: BNBC 2020 sorts sites into classes (SA to SE, plus S1 and S2) using average soil properties of the upper 30 m.
Worked example: 5-katha plot, 9-storey building
Plot 3,600 sq ft; building footprint after setbacks about 12 m by 18 m
Boreholes: 5 (BUET guideline for 3 to 5 katha, and four corners plus centre)
Shallow raft: 1.5 x 12 m = 18 m below a foundation 2 m down, so at least half the boreholes go about 20 m deep
Piles about 20 m long: borings to at least 26 m. Taking them to 30 m also covers the site class depth.
Soil test process for building construction in Bangladesh: on site and in the lab
Planning. Your structural engineer marks borehole positions on the site plan and states the depth required.
Boring. A common method is wash boring: a casing pipe is sunk while a water jet loosens the soil and carries cuttings to the surface.
Standard Penetration Test (SPT). A split-spoon sampler is driven by a 63.5 kg hammer falling 750 mm. The blows for the last 300 mm of a 450 mm drive give the N-value. Under ASTM D1586 this is typically done every 1.5 m, or wherever the soil changes.
Samples. Each SPT gives a disturbed sample for identification. In clay, thin-walled tubes collect undisturbed samples for strength and consolidation tests.
Groundwater. The water level in each borehole is recorded; the code asks for groundwater measurements and their fluctuations.
Laboratory tests. Moisture content, unit weight, grain size, liquid and plastic limits, unconfined compression, direct shear and consolidation. Consolidation tests show how much clay will compress, and so how much the building may settle.
Report. Bore logs, lab results and an engineering evaluation with foundation recommendations.
Soil test cost in Bangladesh (2026)
The clearest published price list is BUET Civil Engineering's BRTC schedule. Rates include 15 percent VAT and university overheads, effective April 2026 and unchanged from December 2024:
Soil boring in Dhaka city up to 20 m: Tk 80,000 per borehole
Up to 25 m: Tk 1,00,000 per borehole
Up to 30 m: Tk 1,35,000 per borehole
Rates include tests and the report; outside Dhaka is priced case by case; urgent work costs 1.5 times
Worked soil test costs at BUET rates
3-katha plot, 3 boreholes to 20 m: 3 x Tk 80,000 = Tk 2,40,000 (Tk 2.4 lakh)
5-katha plot, 5 boreholes to 30 m: 5 x Tk 1,35,000 = Tk 6,75,000 (Tk 6.75 lakh)
10-katha plot, 8 boreholes to 30 m: 8 x Tk 1,35,000 = Tk 10,80,000 (Tk 10.8 lakh)
Plate load test: Tk 97,000 per location plus field fees, minimum Tk 1,75,000 within Dhaka
Pile integrity test: Tk 3,000 per pile plus field fees, minimum Tk 75,000 within Dhaka (BRTC asks for integrity tests on all piles and load tests on at least 1 percent)
Pile load test supervision and report: Tk 1,07,000 per pile plus field fees, minimum Tk 1,35,000 within Dhaka
Cyclic triaxial test for detailed liquefaction studies: Tk 4,00,000
Soil test company prices in Dhaka
Private geotechnical firms set their own prices, typically per borehole or per metre (or foot) of boring. There is no official schedule for them, and we found no reliable published survey of private prices. Their price depends on the number and depth of boreholes, the lab tests included, site access, distance from Dhaka, and whether the report includes engineering recommendations or only raw data.
Compare written quotes for the same scope, and if one is much cheaper, check whether it drills fewer metres or leaves out lab tests. Prices change, so treat every figure here as dated October 2026.
Have a soil report and not sure what it means? Send it to our structural engineers: call +880 1823-017070, email sthapatto@gmail.com or start your project online.
How to read a soil test report in Bangladesh
BNBC expects the report to state its scope, who did the work, the dates of field and lab work, site observations (including groundwater and neighbouring buildings), methods, all results, and an evaluation with its assumptions and limitations. Read it in this order.
1. Borehole plan and bore logs
Check that the boreholes are on your plot and inside the building outline. Each bore log lists the layers by depth, such as "grey soft silty clay" or "brown medium dense fine sand", with the N-value at each test depth and the water level.
2. SPT N-value: what the numbers mean
The N-value is the number of hammer blows for 300 mm of penetration. BNBC uses these guide ranges:
Clay: N below 2 is very soft; 2 to 4 is soft
Sand: N below 10 is loose; 10 to 30 is medium dense; 30 and over is dense
Site class for earthquake design (average N over the top 30 m): below 15 is SD; 15 to 50 is SC; above 50 is SB
A thick layer of soft clay or loose sand near the surface usually rules out shallow footings for a multi-storey building.
A high water table reduces bearing capacity, complicates basements and raises liquefaction risk in loose sand. Note the date of the reading, as levels vary by season.
The report should give an allowable bearing pressure at one or more depths. BNBC applies a factor of safety of 2.0 to 3.0 to the ultimate bearing capacity, depending on how thorough the exploration and site control are, and settlement must also stay within limits. Its minimum depth for exterior footings of permanent buildings is 1.5 m in clay and 2 m in sand.
A useful report recommends a foundation type, a founding depth and, for piles, estimated capacities at different lengths. Your structural engineer checks these against the real building loads.
Dhaka soils: Madhupur clay vs filled and low-lying land
Dhaka sits at the southern tip of the Pleistocene Madhupur tract. Its oldest exposed layer, Madhupur clay, is a reddish clay with silt and fine sand whose properties vary with location and depth (Banglapedia). A Dhaka University disaster science expert told The Daily Star in June 2026 that only about 35 percent of the city stands on this stronger red soil, naming areas such as Old Dhaka, Gulshan, Banani, Dhanmondi, Motijheel, Farmgate and Mirpur. Parts of Basabo, Badda, Uttarkhan and Dakshinkhan have red soil 10 to 20 ft down.
Low-lying and filled land
Near the Buriganga, Turag, Balu and Shitalakkhya rivers, the same expert said, red soil may lie 80 to 150 ft down under soft clay and recent fill. An IEB Journal of Civil Engineering study of reclaimed sites in Bashundhara, Mirpur DOHS, Banasree and Purbachal found 3 to 12 m of dredged, mostly silty sand fill with N-values of 1 to 13, and liquefiable layers in some boreholes at every site. Keraniganj falls in the highest (red) zone of BUET's liquefaction index, as reported in 2026. The Daily Star also reports that housing companies have filled about 7,000 acres of low land near the Turag.
Liquefaction happens when shaking makes loose, saturated sand behave like a liquid, so buildings tilt or sink. A RAJUK and BUET study places about 55 to 60 percent of Dhaka in the red and magenta (highest) zones of its liquefaction hazard map. Experts quoted by The Daily Star say about 90 percent of filled areas rely on piles alone without improving the surrounding soil, and that improving just the top 5 to 6 m can substantially reduce shaking. A 2026 study using 534 boreholes from 140 projects on reclaimed land found very high liquefaction susceptibility at shallow depths in many areas.
The lesson: two plots a few hundred metres apart can need completely different foundations.
Pile vs shallow foundation: how soil decides foundation type and cost
Shallow foundations (isolated footings, combined footings and mat or raft foundations) spread the load over firm soil near the surface. They suit good ground, such as stiff red clay close to the surface, and are usually quicker and cheaper than piles.
Pile foundations carry the load through soft, loose or filled layers to stronger soil below, by skin friction and end bearing. Pile length, diameter and number come straight from the soil report. BNBC requires a minimum overall factor of safety of 2.0 on pile capacity when a load test on site confirms it, and 3.0 otherwise.
Ground improvement such as compaction, stone columns or cement injection can be combined with piles on loose fill to reduce liquefaction risk around them.
A soil test costing a few lakh taka decides whether you need footings or piles, and how long and how many. That decision is worth far more than the test; for wider budgeting, see our building construction cost guide.
Red flags: fake, copied and incomplete soil reports
Copied from a neighbour, or an old report with a new address.
Too few boreholes: fewer than three, all in one line, or none inside the footprint.
Too shallow: borings that stop above the expected pile tip.
Suspiciously neat data: identical layers and N-values in every borehole, or no lab sheets.
Missing basics: no fieldwork dates, no groundwater level, no location plan, no supervising engineer's name and signature.
No interpretation: raw numbers without bearing capacity, settlement or pile capacity.
No rig on site: if nobody drilled, there was no soil test.
Checklist for hiring a soil test company in Dhaka
Ask your structural engineer to write the scope: number, location and depth of boreholes, SPT interval, undisturbed samples and lab tests.
Get two or three written quotes against that same scope.
Ask who the supervising geotechnical engineer is, which standards they follow (such as ASTM D1586) and for a sample report.
Have someone on site on drilling days to note depths and borehole positions.
Agree the report date and contents in writing, including foundation recommendations.
Have your structural engineer review the draft before final payment, and keep the signed original with your approval documents.
How Sthapatto Angon can help
At Sthapatto Angon, our in-house structural design team designs RCC, steel, composite and high-rise structures, and the foundation design follows the soil report. As part of the structural design, our engineers can set out the soil investigation scope before you hire a testing firm, review the report, and then choose between footings, raft and piles, with the architecture and MEP design coordinated around that choice.
Soil investigation scope and report review, including liquefaction and site class
Foundation and structural design to BNBC 2020, coordinated with architectural and MEP drawings
Site supervision and quality control during piling and foundation work
Our work ranges from residential buildings at Bashundhara R/A (7 storeys, completed 2015) and Jolshiri Abashon (9 storeys) in Dhaka to the 18-storey Hilton Tower in Feni (under construction) and the 400,000 sq ft Square Formulation pharmaceutical plant in Kaliakoir, Gazipur.
Frequently asked questions
How much does a soil test cost in Bangladesh?
At BUET's BRTC rates effective April 2026, soil boring in Dhaka costs Tk 80,000 per borehole up to 20 m, Tk 1,00,000 up to 25 m and Tk 1,35,000 up to 30 m, including tests and report. Three 20 m boreholes on a 3-katha plot therefore cost Tk 2.4 lakh there. Private firms set their own prices, so compare written quotes for the same scope.
How many boreholes are needed for a 6-storey building?
It depends more on the plot and footprint than on the number of storeys. The code guidance is at least three boreholes for a small building, not in one line, and at least five for larger buildings. BUET's guideline is 3 for plots up to 3 katha and 5 for 3 to 5 katha.
Is a soil test mandatory for building construction in Bangladesh?
BNBC's soils chapter says a sub-soil investigation shall be done before constructing a new building or altering an existing foundation. RAJUK has also required structural drawings to be approved since April 2023, and they depend on soil data. Confirm the current document list with your architect or the approving authority.
How deep should soil test boring be?
For pile foundations, at least 6 m below the expected pile tip. For heavy buildings on shallow foundations, at least half the boreholes should reach 1.5 times the building width below the foundation. Since BNBC 2020 uses the top 30 m to classify the site, it is sensible for at least one borehole on a multi-storey project to reach 30 m.
What is a good SPT N value for a building foundation?
There is no single pass mark; the engineer looks at the whole profile. As a guide, sand with N of 30 or more is dense and clay with N below 4 is soft.
Can I use my neighbour's soil test report?
No. Dhaka soils change within short distances, especially at the edge of filled land, and the code asks for investigation points under your own building. A neighbour's report is background, nothing more.
How long does a soil test take?
It has two stages, drilling on site and then lab testing and reporting, and the time depends on the number and depth of boreholes. Ask for a written delivery date; BUET charges 1.5 times its fee for urgent work.
ভবন নির্মাণের আগে সয়েল টেস্ট বা মাটি পরীক্ষা মানে প্লটে বোরিং করে মাটির স্তর, এসপিটি এন-ভ্যালু, পানির স্তর এবং ল্যাবে মাটির শক্তি যাচাই করা। বিএনবিসি অনুযায়ী নতুন ভবন নির্মাণের আগে সাব-সয়েল ইনভেস্টিগেশন করতে হয়, আর এই রিপোর্ট দেখেই স্ট্রাকচারাল ইঞ্জিনিয়ার ফাউন্ডেশন ঠিক করেন: সাধারণ ফুটিং, র্যাফট নাকি পাইল। ছোট ভবনে অন্তত ৩টি বোরিং (এক লাইনে নয়), বড় ভবনে অন্তত ৫টি। বুয়েটের নির্দেশনায় ৩ কাঠা পর্যন্ত ৩টি, ৩ থেকে ৫ কাঠায় ৫টি এবং ৬ থেকে ১০ কাঠায় ৮টি বোরিং। পাইলের ক্ষেত্রে বোরিং পাইলের শেষ প্রান্তের অন্তত ৬ মিটার নিচ পর্যন্ত যাওয়া উচিত। বুয়েটের এপ্রিল ২০২৬ রেটে ঢাকায় প্রতি বোরিং ২০ মিটার পর্যন্ত ৮০,০০০ টাকা, ৩০ মিটার পর্যন্ত ১,৩৫,০০০ টাকা। ঢাকার মাটি অল্প দূরত্বেই বদলায়; ভরাট জমিতে লিকুইফেকশনের ঝুঁকি বেশি। তাই প্রতিবেশীর রিপোর্ট কপি করবেন না। রিপোর্ট বোঝা বা ফাউন্ডেশন ডিজাইনের জন্য স্থাপত্য অঙ্গনে ফোন করুন: ০১৮২৩-০১৭০৭০।
Ready to test your soil and design the foundation?